Friday, December 6, 2013

Project Description

  • The blog
    • Use your school gmail account to create a new blog.  Create a title for the blog.  Make sure your name and hour appear somewhere.
    • Look at the example on Ms.Peterson/Mrs.Wilcox’s website if you have questions about how to make the blog.
    • Research the 9-Point Circle and present the information in the blog.  These are the separate posts you must have:
      • History of the 9-Point Circle
      • Discovery (who and how the circle was first discovered)
      • How to Construct (not a step-by-step in-depth guide, just key points of the construction)
      • What I Learned (what you learned as you were constructing, what was difficult, what you thought was cool, etc.)
      • Sources (three sources, including title of the website, title of the article, and the actual address for each)

  • The construction of the 9-Point circle – includes two parts:
    • Construct the 9-Point circle using a compass and straight edge on a blank piece of 8.5” by 11” paper that is NOT lined.
      • Draw an acute scalene triangle.  Side lengths should range between 10 and 17 centimeters.
      • Show all the construction marks used to find each point and label all points with capital letters.
      • Create a key that identifies the names of segments and points as they relate to chapter 5 (medians, altitudes, etc.).

    • Copy the 9-point circle
      • Make a copy of your construction using a photocopier, scanner, or simply by tracing onto another paper.
      • Use many different colored writing utensils to trace the key components, NOT the constructing arcs and irrelevant segments.
      • Create a key for the colored parts.

How to Present Your Results
Your blog should have all five posts listed above.  In addition, you should have two posts for constructions: one post should be a picture of the original construction and another post should be the color-coded picture (see sample blog for ways to get the picture on your blog).  So in total you will have SEVEN posts in your blog.  You will turn in the hard copy of the original construction, the copied construction, and the rubric.

Grading
See the rubric for information on grading.  Double check the rubric before this project is due to make sure you didn’t miss any important parts!

If you don’t want to make a blog …
You may write a formal paper answering the questions above.  Paper should be approximately 2 pages double spaced.  You should turn this in with the two constructions and the rubric in a folder.

If you have questions that may benefit others ...
Write the question in the comments below this post!

This project is due on Tuesday, January 7th.

How to Make a Blog

Alright, so to get started, you'll need to log into your school gmail account.

Account information here!

Next, go to blogger.com and create a new blog by clicking the "New Blog" button.  Make a name and address for your blog.  It should have something to do with the 9-Point circle!

Getting info to teacher here!

To make a post, click the orange "New Post" button in the upper left hand corner of the page.  Read the project description to see what to put in each post.

To change the published time of each post, click the "Published on" box on the right.  This will allow you to put the posts in the order you want.  The oldest posts show up at the bottom of the page.

Once you have your content set, feel free to personalize the set up and design of your blog!  Make it easy to read and eye-catching.

Getting Pictures in a Post

Step 1: Get your picture saved on your computer.  Either:

  • scan your construction and email it to yourself
  • take a picture on your phone and email it to yourself (make sure the picture is of high quality!)


Step 2: Create the post, then click the "Insert Image" icon above.

Step 3: Select your picture and hit "upload" to upload your picture to the post.

Rubric


Geometry                                                                  Name                                 ________.
Scoring Rubric for 9 Point Circle Project                         HR      .

Beginning
1
Developing
2
Accomplished
3
Exemplary
4
Score on Lot 1

The Blog Specifics  

The blog is missing one or more of the required posts or is not neatly organized.
The blog consists of the seven required posts and is neatly organized and eye catching!





Sources
Fewer than 2 sources were cited in a blog post.  Source did not include the requested information.
Fewer than 3 sources have been cited in a blog post.  Each source is missing some of the following; title of website, title of article, and web address.
3 sources have been cited in a blog post.  Each source includes title of website, title of article, and web address.


Grammar
Poor grammar and spelling. Blog is confusing to navigate.
Some correct grammar and spelling are used.  Blog is somewhat confusing to navigate.  
Mostly correct grammar and spelling are used.  
Blog is well formatted and easy to navigate.
Correct grammar and spelling are used.   Blog is well formatted and easy to navigate.

The Content
Sentences make no logical sense and are repetitive.  Content is difficult to understand and not factual. 
Sentences are somewhat logical and some concepts are repeated.  Some content is factual and relates to the 9 point circle.
Sentences are mostly logical and not repetitive.  Most content is factual and relates to the 9 point circle.
Sentences make logical sense and are not repetitive. Content relates to the nine point circle and is factual information.  

Construction
Very few of the lines and arcs are clear and precise.  A straight edge and compass probably wasn’t used in the construction. (It’s questionable)  Few tick marks are shown and construction is very sloppy.
Some of the lines and arcs are clear and precise.  A straight edge and compass may or may not have been used in the construction. (It’s questionable)  Some tick marks are shown and construction is somewhat clear and visible.
Most of the lines and arcs are clear and precise.  A straight edge and compass were used in the construction.  Most tick marks are shown and construction is mostly clear and visible.
All lines are precise and clear.  A straight edge has been used.  Smooth arcs are created with the compass. No erase marks are on the diagram.  All tick marks showing measurement and construction are clear and visible.

Labels
Some points have been labeled.
All points are labeled with capital letters. 



Key
Few constructed segments and points have been identified and labeled in a key as they relate to the concepts learned in chapter 5.  (i.e. midpoints, etc…)
Some constructed segments and points have been identified and labeled in a key as they relate to the concepts learned in chapter 5.  (i.e. midpoints, etc…)
Most constructed segments and points have been identified and labeled in a key as they relate to the concepts learned in chapter 5.  (i.e. midpoints, etc…)
All constructed segments and points have been identified and labeled in a key as they relate to the concepts learned in chapter 5.  (i.e. midpoints, etc…)

Copy of the Construction

The copy is hard to read and a few key components might have been highlighted with different colored writing utensils. 
The copy is somewhat clear and some of the key components might have been highlighted with different colored writing utensils. 
The copy is mostly clear and most of the key components have been highlighted using different colored writing utensils. 
A clear copy of the construction has been made and the key components have been highlighted using different colored writing utensils. 

* 2 point will be deducted every day your project is late.
TOTAL